Risk Assessment, Auditing & Compliance
Statutory task risk assessments, workplace compliance audits, fire risk coordination, CAPA action tracking, and board-le...
Statutory CDM 2015 advisory, Construction Phase Plan (CPP) creation, subcontractor RAMS technical vetting, and independent site safety assurance across the UK.
Construction Phase Plans (CPP), RAMS technical reviews, site compliance audits, contractor competence vetting, and site safety management.
Every deliverable is structured to pass regulatory audits, insurer scrutiny, and Tier-1 procurement requirements under current UK standards.
Standard template CPPs that fail to address project-specific logistics, high-risk interfaces, and fire safety plans.
Generic method statements submitted hours before high-risk works commence with inadequate risk controls.
Subcontractors arriving on site without verified training evidence, inductions, or clear safety expectations.
Site hazards and inspection observations that remain open without verified contractor closeout.
Full alignment with HSE L153 requirements, protecting dutyholders from enforcement notices.
Site-specific, auditable documentation that frontline supervisors actively understand and apply.
Rapid, professional technical review SLA preventing costly project programme delays.
Traceable CAPA tracking ensuring all site inspection hazards are physically verified and closed.
Under Regulation 12 of the CDM Regulations 2015, a project-specific Construction Phase Plan must be prepared before any construction site is established. Kevron supports Principal Contractors and client project teams in developing, reviewing, and maintaining robust, proportionate plans that reflect actual site operations.
We distinguish statutory Risk Assessments (MHSWR 1999) from practical Method Statements, providing rigorous 24–48h technical reviews for Principal Contractors and Subcontractors.
We provide both frontline physical hazard monitoring and strategic management compliance auditing.
Focuses on what is happening on site today: physical edge protection, scaffold tagging, PPE adherence, housekeeping, permit compliance, and immediate hazard remediation.
Focuses on how effectively agreed systems operate over time: CPP adherence, contractor competence verification, statutory plant inspections, fire plan validity, and CAPA closeout.
Temporary works represent some of the highest-risk operations on a construction site. Kevron provides independent health and safety assurance reviews to verify that management procedures, design briefs, independent checking categories (0–3), and permits to load are operating effectively.
Note: Kevron provides procedural H&S management assurance and compliance reviews. We do not provide structural engineering design calculations.
Under Regulation 8 of CDM 2015, Principal Contractors must ensure trade subcontractors possess the required skills, knowledge, experience, and organisational capability. Kevron implements robust pre-qualification questionnaires and mobilization checks to prevent substandard trades from setting foot on site.
We replace repetitive check-box exercises with engaging, task-specific briefings that frontline operatives actively remember and apply.
Structured site visits pairing senior project directors and chartered safety consultants. We facilitate meaningful two-way conversations with frontline teams, identify positive safety behaviours, resolve operational bottlenecks, and generate executive trend reports.
Independent technical review and permit oversight across critical construction disciplines.
Scaffolding handovers, edge protection, MEWP selection, and rescue plans under WAH Regs 2005.
Appointed Person lift plans, crane outrigger pads, and slinger competence under LOLER 1998.
Trench support systems, CAT & Genny service clearance, and edge barriers under HSG47.
Gas monitoring, entry permits, top-man communication, and emergency breathing apparatus.
Explore the primary delivery capabilities included within this practice area.
Bespoke, dynamic CPPs tailored to project scale, logistics, fire safety, and CDM Regulation 12.
Rigorous technical review of lifting plans, temporary works, and high-risk task methodologies.
Scheduled and unannounced physical walkthroughs with timestamped photo scorecards and RAG actions.
Evaluating skills, knowledge, experience, and organisational capability under CDM Regulation 8.
Task-specific briefing packs and worker engagement campaigns for high-risk site activities.
Structured executive site visits, frontline engagement, and senior management trend reporting.
Management arrangements, coordination, and procedural checks aligned with BS 5975 principles.
Independent H&S review of work at height, lifting operations, excavations, and confined space entries.
We deliver auditable, structured documentation and systems that hold up under client prequalification and regulator inspection.
Structured 4-stage engagement milestone framework ensuring complete transparency and compliance.
Reviewing pre-construction information (PCI), designer risk logs, and preparing the project CPP.
Evaluating trade contractor competence, vetting method statements, and coordinating site logistics.
Conducting regular site inspections, worker briefings, high-risk reviews, and leadership walkabouts.
Verifying corrective action closures, compiling the Health & Safety File, and project closeout.
All service deliverables are mapped directly against active UK statutory legislation and international ISO standards.
Construction (Design and Management) Regulations 2015 (HSE Guidance L153).
Work at Height Regulations 2005 for scaffolding, MEWPs, and edge protection.
Lifting Operations and Lifting Equipment Regulations 1998 (Lifting plans and appointed persons).
Code of practice for temporary works procedures and the permissible stress design of falsework.
Designed to fit project lifecycles, corporate compliance roadmaps, and agile procurement requirements.
RAMS Review & Pre-Construction Health Check
Active Project Safety & CDM Advisory
Retained Construction Safety Advisory
Subcontract Project Safety Management
How this practice area adapts to distinct sector operational environments.
Verified outcomes delivered under this practice area.
Delivered 8-floor high-density commercial fit-out with zero reportable RIDDOR incidents.
Managed 15 trade subcontractors across a 400,000 sq ft distribution development with 100% CAPA closure.
This practice area adheres to the Kevron UK controlled delivery baseline, featuring specific technical oversight, evidence standards, and verified action closure protocols.
Construction Phase Plans (CPP), RAMS vetting registers, and statutory F10 notices.
Site hazard notices linked directly to subcontractor packages with milestone close-out dates.
Mandatory photographic re-inspection proof required prior to closing site nonconformities.
Principal Consultant (CMIOSH / APS) sign-off on high-risk construction method statements.
Key answers regarding scoping, delivery timescales, and statutory compliance.
Speak with Kevron Consulting UK Limited today to review your statutory requirements, receive a transparent proposal, or commission a fixed-fee pilot. We respond within 24 business hours.
Pick up where you left off in your recent exploration.
Statutory task risk assessments, workplace compliance audits, fire risk coordination, CAPA action tracking, and board-le...